    Signed the factory design contract of Zhangxuan Hi-Tech Hydrogen Energy Development and Utilization Demonstration Project.

    06th January

    Vietnam Hefa Rongju Steel Co., Ltd 4×1080m³ blast furnace project were put into production.

    11th January

    Organize nucleic acid detection of all employees in the company and its subsidiaries.

    15th January

    Signed the project design contract of clean heat extraction and dry heat treatment system of Hebei Xinda Iron and Steel Group Co., Ltd. (No.2 Steelmaking Plant).

    20th January

    Signed the EPC general contract of the first phase of Langfang Industrial Innovation and Development Base Project of HBIS Group.

    26th January

    Signed the design contract of Qinhuangdao Hongxing Iron and Steel Co., Ltd. special railway line project (dumper yard).

    28th January

    Commend the advanced administrative collectives and individuals in 2020, and awarded 19 awards including outstanding contributions of advanced collectives and individuals, production pacesetters and excellent projects.

    18th January

    Commend the advanced collectives and individuals in the Party in 2020, and awarded five awards, including advanced party branch, outstanding party worker and advanced individual in epidemic prevention.

    30th January

    Hebei Xinda Iron & Steel Group Co., Ltd. (No.2 Steelmaking Plant) started construction of the clean heat extraction and dry heat treatment system project.

    31th January

    Hot test of high-bar production line of rolling system in Long Products Project of HBIS Industrial Upgrade and Xuan Steel Capacity Transfer Project.

    01th February

    Signed the design contract for comprehensive upgrading and reconstruction project of sintering machine of Tangshan Fengnan Jingan Iron and Steel Co., Ltd.

    07th February

    Hot test of medium-sized production line of rolling system in Long Products Project of HBIS Industrial Upgrade and Xuan Steel Capacity Transfer Project.

    08th February

    Hot test of 1# high speed wire rod of rolling system in Long Products Project of HBIS Industrial Upgrade and Xuan Steel Capacity Transfer Project.

    13th February

    Liu Yuansheng, Chairman, Dong Wenjin, General Manager, Cao Yuan, Party Secretary and Deputy General Manager, went to Tangsteel New District of HBIS to consolated the frontline employees who stick to the project construction during the festival.

    15th February

    The EPC general contracting project of environmental protection promotion of HBIS Laoting Steel started construction.

    18th February

    Signed the EPC general contracting project contract for intelligent manufacturing of Tangshan Jiahua Company's chemical park.

    20th February

    The main control building of steelmaking system in Long Products Project of HBIS Industrial Upgrade and Xuan Steel Capacity Transfer Project is put into use.

    04th March

    Hot test of 3# converter and 1# caster of steelmaking system in Long Products Project of HBIS Industrial Upgrade and Xuan Steel Capacity Transfer Project.

    08th March

    Qinhuangdao Hongxing Iron & Steel Co., Ltd. started construction of special railway line project (dumper yard).

    10th March

    The steam injection project of sintering machine in Tangsteel New Area of HBIS was put into operation.

    14th March

    The comprehensive upgrading project of sintering machine of Tangshan Fengnan Jingan Iron and Steel Co., Ltd. started construction.

    15th March

    Signed the equipment supply contract for the filtration system of concentrate pipeline transportation terminal and the PLC control system of buffer bin of HBIS Industrial Upgrade and Xuan Steel Capacity Transfer Project

    16th March

    The EPC general contracting project of the first phase of Langfang Industrial Innovation and Development Base Project of HBIS Group started construction.

    18th March

    The second set of 40,000 Nm³/h oxygen production is put into use in the second phase of supporting gas project of HBIS Industrial Upgrade and Xuan Steel Capacity Transfer Project.

    22th March

    Signed the design contract for the raw material system reconstruction project of Tangshan Ruifeng Iron and Steel (Group) Co., Ltd..

    29th March

    Hot test of 2# converter and 2# continuous casting machine in steelmaking system of iLong Products Project of HBIS Industrial Upgrade and Xuan Steel Capacity Transfer Project.

  • Second quarter

    13th April

    Inner Mongolia Saisipu Technology Co., Ltd. put into operation the 300,000-ton high-purity cast pig iron project by melting reduction method, and CISP melting reduction ironmaking process was successfully applied.

    18th April

    Shanxi Hongda Iron and Steel Group Co., LTD. 2× 100T converter steelmaking project put into operation.

    18th April

    Tangshan Ruifeng Iron and Steel (Group) Co., LTD. Raw material system renovation project started construction.

    26th April

    HBIS industrial upgrading and Xuansteel capacity transfer project hot test of 2# high speed wire for rolling system in long material engineering.

    07th May

    Signed the project design and equipment procurement EPC contract for hydrogen and nitrogen production project of Tangsteel high strength automobile plate Co., LTD.

    07th May

    Set up project department for design and equipment procurement EPC contract of hydrogen and nitrogen production project in Tangsteel high strength automobile plate Co., LTD. Project construction starts.

    12th May

    Sign EPC project contract for coke storage receiving and unloading yard renovation project of Chengde Branch of HBIS Co., LTD.

    14th May

    Members of the organization and leading groups of the Party Committee, secretaries of Party branches, and heads and vice-ministers of all departments signed the 2021 Responsibility Statement to build a fine Party culture and a corruption-free Party.

    17th May

    Signed the design contract of 2# blast furnace gas fine desulfurization project of Ningbo Iron and Steel Co., LTD.

    18th May

    Signed the design contract of annual output of 100,000 tons of wear-resistant ball project of Tangshan Zhiwei Equipment Manufacturing Co., LTD.

    21th May

    Carry out internal audit in 2021.

    21th May

    HBIS industrial upgrading and Xuansteel capacity transfer project the raw material EPC project won the 2021 National Metallurgical Industry Project Quality Excellence Award.

    21th May

    HBIS industrial upgrading and Xuansteel capacity transfer project the Pellet fine powder yard EPC project won the 2021 National Metallurgical Industry Project Quality Excellence Award.

    21th May

    HBIS industrial upgrading and Xuansteel capacity transfer project office building in front of the plant EPC project won the 2021 National Metallurgical Industry Project Quality Excellence Award.

    10th June

    Issued the "General Plan of TSIC Relocation work", established the company relocation work group, with the coordination and supervision working group, environmental preparation working group, system and network preparation working group, property management preparation working group, relocation implementation working group, planning and publicity working group.

    01th June

    The 20th National safety production activities Month was held with the theme of "Implementing safety Responsibilities and promoting safe Development".

    03th June

    Signed EPC contract of HBIS Laoting Steel Environmental Protection Upgrading project for HBIS industrial upgrading and Xuansteel capacity transfer project

    08th June

    Signed the general design contract of phase II of HBIS Laoting Steel Base Project.

    19th June

    Zhangxuan High-tech Hydrogen energy development and utilization demonstration project start construction.

    22th June

    Signed the design contract of Hebei Anfeng Iron and Steel Co., LTD. Surface water comprehensive utilization project.

    22th June

    Signed the engineering design contract of six-machine six-strand flat billet continuous caster of Ningxia Shenyin Steel Making Co., LTD.

    28th June

    Ningxia Shenyin Steel Rolling Co., LTD. 850mm hot strip rolling project started construction.

    28th June

    The annual output 100,000 tons of wear-resistant ball project for Tangshan Zhiwei Equipment Manufacturing Co., LTD. started construction.

    28th June

    "BIM Technology-based 3D Digital Factory Project of HBIS Tangsteel New District " won the third-class Achievement Award of the second Engineering construction Industry BIM Competition.

    30th June

    To sign of HBIS industrial upgrading and Xuansteel capacity transfer project EPC Project contract of Ultra-low Emission Intelligent Control System (unorganized emission) of HBIS Tangsteel.

  • Third quarter

    01th July

    The theme of "Reviewing the Pledge of Party Membership and singing the Red Classic Song" for the 100th anniversary of the founding of the CPC.

    05th July

    Construction start of EPC project for coke storage receiving and unloading yard renovation project of Chengde Branch of HBIS Co., LTD.

    12th July

    The company and its subsidiary Hebei Three-Ring through 2021 quality, environment and occupational health system certification audit.

    14th July

    HBIS industrial upgrading and Xuansteel capacity transfer project Hot test of 4# CCM of long material engineering steelmaking system, and long material engineering was put into operation completely.

    15th July

    HBIS industrial upgrading and Xuansteel capacity transfer project EPC project of office building in front of the factory won the first prize of National Metallurgical Industry Engineering Design Outstanding Achievement in 2021.

    15th July

    The demonstration project of pellet flue gas oxidation denitration technology of Qinglong Furnace Charge Company won the first prize of National Metallurgical Industry Engineering Design Outstanding Achievement in 2021.

    15th July

    河钢产业升级及宣钢产能转移项目烧结区域EPC总承包AYX爱体育1#、2#烧结机烟气循环系统项目投产。

    15th July

    河北安丰钢铁有限公司地表水综合利用项目开工建筑。

    26th July

    HBIS industrial upgrading and Xuansteel capacity transfer project EPC project of pellet fine powder yard won the second prize of National Metallurgical Industry Engineering Design Outstanding Achievement in 2021.

    26th July

    The EPC general contracting project of the office building in front of the plant of Industrial upgrading of HBIS and production capacity transfer of Xuanhua Iron&Steel Group Co., Ltd. project won the second-class achievement award of Hebei Engineering Survey and Design Project in 2021.

    26th July

    The demonstration project of pellet flue gas oxidation denitrification technology of Tangshan Qinglong charging Co., Ltd. won the second-class achievement award of Hebei Engineering Survey and Design Project in 2021.

    26th July

    EPC general contracting project of raw material area of Industrial upgrading of HBIS and production capacity transfer of Xuanhua Iron and Steel Group Co., Ltd. project won the third-class achievement award of Hebei Engineering Survey and Design Project in 2021.

    27th July

    Tangshan Jianlong Janeboat Steel Co., Ltd. Cold rolling improvement project design contract was signed.

    27th July

    The project design contract of 1200m ³blast furnace ore and coke shed project of the second phase of ironmaking plant of Qinhuangdao Hongxing Iron and Steel Co., Ltd. was signed.

    28th July

    Ningxia Shenyin Steel Making Co., Ltd. started construction of six-machine and six-strand flat billet continuous caster project.

    30th July

    The EPC general contracting project of Industrial upgrading of HBIS and production capacity transfer of Xuanhua Iron&Steel Group Co., Ltd. project put into production.

    30th July

    The decoration project of Block A and C of TSIC Green Metallurgical Engineering Technology Research and Development Center project has been completed.

    01th August

    "TSIC Hope Project-Gongxian Student Aid Project" was implemented in the third year, donating 19 poor freshmen from Gongxian County, Sichuan Province to the university campus.

    05th August

    The EPC general contracting project contract of the second phase of the raw material conveyor belt machine corridor project of HBIS Laoting Steel Co., Ltd. was signed.

    10th August

    Raw material plant NO.8 sintering machine comprehensive upgrading project of Hebei Xinda Iron and Steel Corp. Ltd. started construction.

    17th August

    "Design optimization of large environmental protection material yard project and application and innovation of slip method construction technology" won the third prize of Hebei Metallurgical Science and Technology.

    22th August

    Tangshan Jianlong Janeboat Steel Co., Ltd. Cold rolling improvement project started construction.

    08th September

    The design contract of the new TGS lime kiln project in the North District of Tangshan Yanshan Iron &Steel Co., Ltd. was signed.

    09th September

    The China Survey and Design Association announced the ranking of general contracting turnover of survey and design enterprises in 2021, and TSIC ranked 102nd.

    17th September

    The main structure of the project of Langfang Industrial Innovation and Development Base of HBIS was checked and accepted.

    18th September

    TSIC and its subsidiary Bohai Guoxin have passed the review of the national high-tech enterprises, and the subsidiary Hebei Sanhuan has been approved to become a national high-tech enterprise.

    23th September

    The design contract of Chengde Yanbei Metallurgy Materials Co., Ltd. Vanadium slag pretreatment migration and transformation project was signed.

    26th September

    The design contract of Shanxi Hongda Iron and Steel Group Co., Ltd. pipe belt conveyer project was signed.

  • Fourth quarter

    10th October

    The decoration project of TSIC Green Metallurgical Engineering Technology Research and Development Center project has passed the fire control acceptance.

    12th October

    The design contract of Tangshan Ruifeng Steel and Iron (Group) Co., Ltd. Sintering machine energy-saving and environmental protection upgrade project was signed.

    14th October

    The design contract of Tangshan Songting Iron & Steel Co., Ltd. raw material transportation system and material yard project was signed.

    15th October

    The project of TSIC Green Metallurgical Engineering Technology Research and Development Center project won the structural quality Engineering Award of Hebei Province in 2020.

    18th October

    The annual output of 3.1 million tons of new metal material project of Tangshan Qianchen Metal Material Co., Ltd. started construction.

    20th October

    The new TGS lime kiln project in the North District of Tangshan Yanshan Iron &Steel Co., Ltd. started construction.

    25th October

    EPC transformation project of environmental protection promotion of Tangshan Jiahua Coal Chemical Co., Ltd. logistics project (coal and coke unloading area) started construction.

    04th November

    The company signed the EPC general contract for the upgrading of the main process and production line supporting facilities of the HBIS industrial upgrading and HBIS Xuan Steel production capacity relocation project.

    09th November

    The company's market entity type was changed to a limited liability company, and its name was changed to Tang Steel International Engineering Technology Co., Ltd., and its business address was changed to No. 599, Ronghua West Road, Lubei District, Tangshan City.

    10th November

    订勉县广聚龙钢铁制品有限公司60万吨冷轧热镀项目设计合同。

    15th November

    The vanadium slag pretreatment reformation project of Chengde Yanbei Metallurgical Materials Co., Ltd. started construction.

    16th November

    The company signed the design contract for the environmental protection supporting reformation project of the power auxiliary system of Tangshan Medium Thick Plate Co. Ltd.

    16th November

    The company signed the design contracts for the upgrading and renovation project of the environmental protection dust removal system before iron, the new dust remover project of the blast furnace raw material system and the new dust remover project of the sintering raw material system for the comprehensive treatment of the environmental protection upgrading and reformation of the iron-making area of Tangshan Medium Thick Plate Co. Ltd.

    20th November

    The construction of the power auxiliary system environmental protection supporting reformation project of Tangshan Medium and Thick Plate Co. Ltd. started.

    20th November

    The upgrading and reconstruction project of the environmental protection and dust removal system in front of the iron, the new dust remover project of the blast furnace raw material system and the new dust remover project of the sintering raw material system for the comprehensive treatment project of the iron making area of Tangshan Medium and Thick Plate Co. Ltd. was under control.

    23th November

    The construction of phase II EPC project of raw material conveyor corridor of Laoting Iron and Steel Co., Ltd. of Hegang started.

    25th November

    Monthly fire safety training and emergency evacuation drills with the theme of "implementing fire responsibility and preventing safety risks" was carried out.

    28th November

    The whole system of the pilot-scale project of fine desulfurization of blast furnace gas in HBIS Tangsteel New zone has been ventilated, and the test has officially started.

    29th November

    The technical consultation contract for the preservation of history and culture of HBIS Tangsteel's relocation project was signed.

    29th November

    The three-dimensional topographic map surveying and mapping contract for Houtun and Huahai area of HBIS Tangsteel Old Industrial Zone Relocation (Kaiping District) project was signed.

    29th November

    The three-dimensional topographic map of Houtun area of HBIS Tangsteel Old Industrial Zone Relocation (Kaiping District) project began to be surveyed and mapped.

    01th December

    "Green and Intelligent New Generation Process Steel Plant - New Tang Steel Design Collection" was published.

    06th December

    Qinhuangdao Hongxing Steel Co., Ltd. iron and steel joint reduction, replacement and upgrading project 3# blast furnace gravity dust collector pneumatic ash discharge system was put into operation.

    16th December

    "Digital Delivery Platform for Metallurgical Enterprises Based on BS Architecture" won the Industry Advanced Award in the 3rd BIM Technology Application Achievement Competition of Metallurgical Construction Industry.

    16th December

    "BIM design of the front area of HBIS Tangsteel New Zone" won the industry advanced award in the third BIM Technology Application Achievement Competition in the metallurgical construction industry.

    19th December

    The construction of Tangshan REAFON Iron and Steel (Group) Co., Ltd. sintering machine energy-saving and environmental protection upgrading and Reformation project Started.

    20th December

    "BIM design of the raw material area of HBIS Tangsteel New Area" won the first prize of the second "Jiankan Cup" BIM Design Application Achievement Competition of Hebei Province Survey and Design Association.

    21th December

    The Chinese Society for Metals held a scientific and technological achievement evaluation meeting on "Digital and Green New Steel Plant Construction Method and Engineering Practice", and identified this scientific and technological achievement as reaching the international leading level. Participants: HBIS Group Co., Ltd., MCC Capital Engineering & Research Incorporation Limited, Tang Steel International Engineering Technology Co., Ltd., China MCC22 Group Metallurgical Group Co., Ltd.

    22th December

    "Tangshan Metallurgical Intelligent Manufacturing Technology Innovation Center" passed the review of Tangshan Science & Technology Bureau and was officially established.

    23th December

    The China Iron and Steel Association publicized ‘The Progress of Ultra-Low Emission Reformation, Assessment And Monitoring of HBIS Laoting Iron and Steel Co., Ltd.’, in which HBIS Laoting Iron and Steel Co., Ltd passed the ultra-low emission assessment and acceptance of the whole process.

    28th December

    Certified by the national intellectual property management system.

  •  

     
  •  

     
  •  

     
  •  

     

2020Chronicle of the year

  • First quarter

    13th January

    签订河钢产业升级及宣钢产能转移项目配套水渣加工矿粉项目一期AYX爱体育设计合同。

    16th January

    签订唐钢新区厂前区行政办公中心展厅EPC总承包AYX爱体育合同。

    17th January

    召开2019年度总结表彰暨2020年工作动员大会,董事长刘远生作题为《振奋精神 再鼓干劲 在接续奋斗中书写亚美体育新辉煌》的重要讲话,总经理董文进代表公司向大会作《2019年度工作报告》,全面总结2019年度工作成绩,指出2020年总体工作思路。党委书记、副总经理曹原,副总经理刘存钧、张文来、安连志出席会议,副总经理陈丽萍主持会议。

    17th January

    表彰2019年度行政先进集体和先进个人(亚美体育字〔2020〕5号),共计颁发先进集体、个人突出贡献、生产标兵、精品AYX爱体育等19个奖项,17个集体和175名个人受到表彰。

    17th January

    表彰2019年度党内先进集体和先进个人(亚美体育党发〔2020〕1号),共计颁发先进党支部、党风廉政建筑先进个人、优秀党员等4个奖项,1个党支部和41名个人受到表彰。

    21th January

    董事长刘远生在公司综合例会上就防范新型冠状病毒肺炎疫情做出预警,提出“早重视、早预防、早宣传、早排查”原则,提示各部门、各子分公司全体员工密切关注疫情发展,尽早树立主动防范意识。

    22th January

    通过公司微信公众平台面向社会发出关于新冠肺炎防范方法的温馨提示。

    23th January

    为全体员工配发新冠疫情防护口罩。

    24th January

    启动公司传染病防控工作应急预案,实行全员体温检测日报告、零报告制度。

    25th January

    领导团队发布《致全体员工的一封信》,明确公司防疫工作要求,并向员工提出“在家过春节、外出戴口罩、勤洗手、多运动、健康饮食”等八条防疫建议。

    26th January

    发布《关于成立新冠肺炎疫情防控工作领导小组的通知》,成立由董事长刘远生、总经理董文进、党委书记兼副总经理曹原任组长,各部门、各子分公司负责人为成员的新冠肺炎疫情防控工作领导小组。

    26th January

    通过湖北省慈善总会设立“亚美体育抗击新型肺炎疫情专项基金”,共募集员工和社会捐款40436.3元。

    03th February

    配合疫情防控需要,公司领导返岗办公,其他员工以远程办公模式开展工作。

    07th February

    发布《关于进一步加强新型肺炎防控和推迟员工返岗时间等工作的通知》。

    07th February

    向各施工单位发布《关于做好疫情防控期间总承包项目复工工作的通知》。

    09th February

    发布《坚守本职 共克时艰——关于公司全面复工的动员信》,号召员工在共抗疫情的战斗考验中,与广大客户坚定同行,以更加严谨的作风和更加高效的服务,为客户做好最坚强的技术后盾。

    10th February

    公司全面复工,部长返岗办公,其他员工继续采取远程办公模式开展工作。

    10th February

    发布《亚美体育员工远程办公指导手册(V1.0)》。

    13th February

    发布《关于进一步加强全面复工后疫情防控工作和恢复部分现场办公的通知》。

    24th February

    Delta Tang d.o.o. Beograd(中塞达唐有限公司)在塞尔维亚共和国首都贝尔格莱德市注册成立。

    06th March

    各总承包AYX爱体育现场全面复工。

    09th March

    副总经理陈丽萍代表公司向路北区红十字会捐赠现金10万元,用于援助支持路北区抗疫、防疫工作。

    19th March

    签订唐山中厚板材有限公司炼钢物流系统改造项目设计合同。

    19th March

    签订承德建龙特殊钢有限公司钒钛新原料升级改造项目215㎡烧结机AYX爱体育设计合同。

    25th March

    副总经理陈丽萍深入各总承包AYX爱体育现场,督导检查疫情防控及复工复产工作,强调特殊时期下,抗疫复工两手抓、两手硬,确保项目施工安全质量,加快推进建筑进度。

  • Second quarter

    08th April

    签订唐钢新区长材AYX爱体育在线检化验设施EPC总承包AYX爱体育合同。

    15th April

    全体党员自愿捐款19326元,用于支持国家新冠肺炎疫情防控工作。

    15th April

    获评北京建龙重工集团有限公司“2019年度优秀供应商”,并获建龙集团感谢信。

    15th April

    签订承德燕北冶金原料有限公司新建TGS680石灰窑AYX爱体育设计合同。

    15th April

    中厚板1#高炉大修项目1#高炉出铁。

    23th April

    裕祥卓一通过国家住建部资质升级审核,获“AYX爱体育造价咨询甲级资质”。

    27th April

    签订河钢塞钢8万m³高炉煤气柜及配套设施建筑AYX爱体育EPC合同。

    29th April

    签订河钢塞钢高炉配套鼓风机汽拖改电拖EPC总承包AYX爱体育合同。

    01th May

    发布《管理体系手册(2020版)》。

    01th May

    河钢产业升级及宣钢产能转移项目厂前区EPC总承包AYX爱体育竣工投用。

    05th May

    签订河钢塞尔维亚有限公司技术改造项目转炉煤气回收系统AYX爱体育(炼钢)EPC合同。

    14th May

    河钢产业升级及宣钢产能转移项目长材AYX爱体育在线检化验设施EPC总承包AYX爱体育开工。

    15th May

    开展2020年度内部审核工作。

    18th May

    签订唐山建龙简舟钢铁有限公司冷轧系统技改AYX爱体育项目设计合同。

    25th May

    签订河钢产业升级及宣钢产能转移项目配套气体项目2×4万Nm³/h制氧机组AYX爱体育设计合同。

    28th May

    发布《亚美体育设计制图规范 V1.0》。

    01th June

    开展以“消除事故隐患,筑牢安全防线”为主题的全国第19个安全生产月活动。

    01th June

    河钢产业升级及宣钢产能转移项目配套气体项目2×4万Nm³/h制氧机组AYX爱体育开工。

    05th June

    青龙炉料公司实施球团烟气氧化脱硝技术示范AYX爱体育竣工投产。

    10th June

    签订秦皇岛宏兴钢铁有限公司钢铁联合减量置换升级改造项目1#高炉重力除尘器气力卸灰系统设备供货及技术服务合同,采用了公司专利产品——高炉重力除尘灰气力输送装置。

    18th June

    开展2020年度管理评审工作。

    18th June

    在《河北冶金》(CN13-1172/TF)发表“河钢唐钢新区项目”论文集,河钢集团副总经理王新东为论文集做序,共发表各专业技术论文31篇。

    28th June

    获河钢唐钢党委颁发“防疫先进党组织”荣誉称号。

  • Third quarter

    08th July

    中厚板公司储焦储矿系统污染治理升级改造项目获河北省勘察设计咨询协会颁发2020年勘察设计项目成果认定三等奖。

    18th July

    团委组织青年员工开展第二届“企业文化杯”足球比赛活动。

    20th July

    河钢产业升级及宣钢产能转移项目原料区域EPC总承包AYX爱体育投产运行。

    20th July

    签订唐山钢联焦化有限责任公司 5#、6#焦炉绿化搬迁AYX爱体育化产提盐AYX爱体育设计合同。

    22th July

    副总经理陈丽萍代表公司深入唐钢新区原料、烧结项目现场慰问一线员工。

    01th August

    团委组织青年员工开展第二届“企业文化杯”篮球比赛活动。

    19th August

    第二年启动“亚美体育希望AYX爱体育——珙县助学项目”,捐助21名四川珙县籍贫困新生走进大学校园。

    23th August

    河钢乐亭钢铁项目精矿管道输送终端过滤系统及缓冲料仓EPC总承包项目开工。

    24th August

    公司及河北三环通过华夏认证中心2020年度质量、ayx爱游戏官方app平台入口、职业健康体系审核。

    25th August

    签订唐山钢联焦化有限公司5#、6#焦炉绿化搬迁AYX爱体育煤压站EPC总承包AYX爱体育合同。

    26th August

    签订河钢乐亭钢铁项目精矿管道输送终端过滤系统及缓冲料仓EPC总承包AYX爱体育合同。

    01th September

    通过河北省特种设备技术检查中心对公司压力管道行政许可资格监督检查。

    03th September

    秦皇岛宏兴钢铁有限公司钢铁联合减量置换升级改造项目2#高炉投产。

    04th September

    河钢产业升级及宣钢产能转移项目配套气体系统项目1#6万Nm³/h制氧机组投产运行。

    07th September

    董事长刘远生,总经理董文进,党委书记、副总经理曹原参加河钢集团转型升级和结构调整标志性项目——河钢唐钢新区投产仪式。河钢集团党委书记、董事长于勇,总经理、党委副书记王兰玉,副总经理王新东,党委副书记李炳军,副总经理刘键出席。

    10th September

    河钢产业升级及宣钢产能转移项目烧结区域EPC总承包AYX爱体育1#烧结机投产。

    10th September

    河钢产业升级及宣钢产能转移项目厂前区行政办公中心展厅EPC总承包AYX爱体育竣工投用。

    25th September

    唐山钢联焦化有限公司5#、6#焦炉绿化搬迁AYX爱体育煤压站EPC总承包AYX爱体育开工。

    25th September

    签订海城市恒盛铸业有限公司210㎡烧结机AYX爱体育设计合同。设计内容:新建一座210㎡烧结机,包括烧结主线、烟气脱硫公辅、余热锅炉配套、SHRT配套设计及烟气循环配套、地基处理等。

    29th September

    签订宁夏申银烧结有限公司180㎡烧结机升级改造、料场改造AYX爱体育设计合同。

    22th September

    开展企业文化系列活动之“迎中秋•共团圆”中秋主题活动。

    15th October

    河钢产业升级及宣钢产能转移项目配套石灰窑系统项目1#、3#石灰窑投产。

  • Fourth quarter

    09th October

    河北三环乐亭新基地全面投用。

    13th October

    亚美体育绿色冶金AYX爱体育技术研发中心项目A、B、C三座单体封顶。

    26th October

    河钢产业升级及宣钢产能转移项目球团精粉料场EPC总承包AYX爱体育竣工投用。

    30th October

    河钢产业升级及宣钢产能转移项目烧结区域EPC总承包AYX爱体育2#烧结机投产。

    01th November

    获评“2020年度河北省知识产权优势企业”。

    01th November

    开展以“关注消防,生命至上”为主题的消防月安全培训。

    06th November

    签订河钢唐钢退城搬迁项目唐钢南区、唐钢北区、炼焦制气厂三维地籍测量合同。

    10th November

    签订唐钢威立雅(唐山)水务有限责任公司酚氰废水处理系统升级改造及扩建项目EPC合同。

    10th November

    唐钢威立雅(唐山)水务有限责任公司酚氰废水处理系统升级改造及扩建项目开工。

    24th November

    中厚板公司储焦储矿系统污染治理升级改造项目获中国冶金建筑协会颁发冶金行业AYX爱体育设计优秀成果三等奖。

    25th November

    签订唐钢威立雅(唐山)水务有限责任公司UFRO加药间3D仿真设计合同。

    01th December

    亚美体育、河北三环(含裕祥卓一)开展2020年度员工绩效测评工作,总监级及以下共494名员工参与测评。

    03th December

    签订唐山瑞丰钢铁(集团)有限公司铁路专用线装卸及转运系统设计合同。

    03th December

    签订唐山瑞丰钢铁(集团)有限公司减量置换转型升级项目厂前区设计合同。

    03th December

    河钢产业升级及宣钢产能转移项目配套气体项目2×4万Nm³/h制氧机组1#万Nm³/h制氧机组投产。

    08th December

    副总经理陈丽萍代表公司深入唐钢新区长材炼钢连铸总承包项目现场慰问一线员工。

    17th December

    陕西汉中钢铁集团有限公司电炉升级改造AYX爱体育投产。

    18th December

    内蒙古赛思普科技有限公司30万吨熔融还原法高纯铸造生铁项目热风炉点火成功。

    20th December

    亚美体育绿色冶金AYX爱体育技术研发中心项目BIM设计获中国冶金建筑协会颁发全国第二届冶金行业BIM应用技能大赛设计组二等奖。

    20th December

    河钢唐钢新区烧结区域BIM设计项目获中国冶金建筑协会颁发全国第二届冶金行业BIM应用技能大赛设计组三等奖。

    25th December

    获评“河钢唐钢2020年度优秀法律事务管理单位”。

    31th December

    发布《关于精细落实疫情防控管理措施的通知》(亚美体育字〔2020〕32号),要求公司各部门、子分公司要着重抓好输入性疫情的防控工作,确保疫情防控工作实现“零输入、零感染、零传播”的目标。

  •  

     
  •  

     
  •  

     
  •  

     

2019Chronicle of the year

  • First quarter

    18th January

    召开2018年度总结表彰暨2019年工作动员大会,董事长刘远生代表公司作《2018年度工作报告》,全面总结2018年度工作成绩,部署2019年工作任务。总经理董文进、党委书记张文国、副总经理曹原、刘存钧、张文来、安连志出席大会,会议由行政总监陈丽萍主持。

    18th January

    表彰2018年度行政先进集体和先进个人,共计颁发先进集体、个人突出贡献、生产标兵、精品AYX爱体育等17个奖项,23个集体和154名个人受到表彰。

    18th January

    表彰2018年度党内先进集体和先进个人,共计颁发先进党支部、党风廉政建筑先进个人、优秀党员等4个奖项,1个党支部和41名个人受到表彰。

    15th February

    “石灰窑圆盘出灰机传动机构”获得国家实用新型专利(专利号:ZL 2018 2 1053951.5),发明人:赵春光、董洪旺、崔霄霖。

    19th February

    “一种烧结环冷机三段烟气利用系统”获得国家实用新型专利(专利号:ZL 2018 2 1052844.0),发明人:麻江文、张春、李玉清、赵铮。

    22th March

    “一种单膛石灰竖窑窑顶受料斗除尘装置”获得国家实用新型专利(专利号:ZL 2018 2 1051922.5),发明人:赵春光、董洪旺、崔霄霖。

  • Second quarter

    15th April

    开展2019年度内部审核。

    11th May

    组织青年员工开展“立足岗位勇担当,青春建功新时代”主题活动,参观游览承德市兴隆山景区,党委书记张文国带队。

    29th May

    “伊朗ESCO喷煤AYX爱体育”获Bentley公司举办的“2018基础设施年度光辉大赛”制造领域BIM进步奖。

    17th June

    内蒙古赛思普科技有限公司在内蒙古乌海市成立,注册资本5000万元,唐山裕祥新源绿化科技有限公司参股5%。

    18th June

    召开职工代表会议,选举安连志为第二届董事会职工董事,选举李国柱为第二届监事会职工监事。

    18th June

    召开2019年第二次临时股东大会,选举刘远生、韩毅、董文进、张文国、曹原、张文来为公司第二届董事会董事,选举李迎昌、刘建新为公司第二届监事会监事。

    18th June

    召开第二届董事会第一次会议,选举刘远生为第二届董事会董事长,继续聘任刘存钧为公司副总经理(聘期两年)。

    21th June

    召开第二届监事会第一次会议,选举李迎昌为第二届监事会主席。

    21th June

    党委书记张文国代表公司深入现场慰问一线员工。

    21th June

    党委书记张文国带领党员代表到李大钊故居开展“不忘初心、牢记使命”重温入党誓词活动。

    26th June

    开展2019年度管理评审工作。

  • Third quarter

    05th July

    唐钢炼铁北区大型绿化料场AYX爱体育获唐山bob综合体育官网app下载筑AYX爱体育新唐杯奖(市优质AYX爱体育)。

    08th July

    唐自信(唐山)信息技术有限公司在唐山市成立,注册资本1000万元,唐山钢铁设计研究院有限公司持股 100%。

    15th July

    华夏认证中心对公司进行2019年度质量、ayx爱游戏官方app平台入口、职业健康体系审核。

    09th August

    “亚美体育希望AYX爱体育-2019年珙县助学项目”启动,公司捐赠30万元用于援助四川珙县籍60名家庭贫困大学新生。

    22th August

    市政行业(ayx爱游戏官方app平台入口卫生AYX爱体育、排水AYX爱体育、城镇燃气AYX爱体育、给水AYX爱体育、热力AYX爱体育)专业乙级资质、电力行业(变电AYX爱体育)专业丙级资质延续。

    28th August

    “亚美体育绿色冶金AYX爱体育技术研发中心项目”正式开工建筑。

    10th September

    “一种高磷铁水的双联冶炼脱磷工艺”获得国家发明专利(专利号: ZL 2017 1 0907621.1),发明人:张达、孙玉霞、安连志、黄彩云、刘远生、董文进、张文来、韩志杰、邓玉平。

    12th September

    党委书记张文国代表公司深入现场慰问一线员工。

    20th September

    开展“我与国旗合张影” 员工风采展映活动。

    20th September

    开展“我和我的祖国”书画摄影展活动,22人获优秀奖、61人获参与奖。

    26th September

    河钢乐亭原料场BIM设计项目获中国冶金建筑协会颁发全国冶金行业BIM应用技能大赛设计组三等奖。

    30th September

    举办2019年“企业文化杯”三维设计大赛。

  • Fourth quarter

    07th November

    绿化事业部“河钢产业升级及宣钢产能转移厂前区项目”设计作品获“《暖通空调》新技术设计大赛”铜奖。

    26th November

    蓝凌统一信息化平台正式上线,公司信息化系统整体优化升级。

    26th November

    启动2019年360°绩效测评工作。

    03th December

    亚美体育董事长刘远生、塞尔维亚DELTA公司董事长Vojislav Todorovic在亚美体育会议中心签署合资备忘录,双方一致商定在塞尔维亚合资成立“中塞达唐有限公司”,主营AYX爱体育设计、AYX爱体育技术咨询等业务,服务河钢塞钢和“一带一路”建筑。

    07th December

    28名员工代表公司参加2019第六届唐山环城水系城市徒步大会,董事长刘远生带队。

    11th December

    唐钢炼铁北区大型绿化料场AYX爱体育获2019年河北省优秀AYX爱体育勘察设计奖。

    12th December

    通过测绘资质晋级申请,AYX爱体育测绘资质晋升为乙级。

    19th December

    唐钢炼铁北区大型绿化料场AYX爱体育获2019 年度冶金行业AYX爱体育质量优秀成果奖。

    19th December

    中厚板料场污染综合治理升级改造AYX爱体育获2019 年度冶金行业AYX爱体育设计优秀成果奖二等奖。

    19th December

    不锈钢料场改造AYX爱体育获2019 年度冶金行业AYX爱体育设计优秀成果奖二等奖。

    19th December

    不锈钢钢渣处理AYX爱体育获2019 年度冶金行业AYX爱体育设计优秀成果奖二等奖。

    19th December

    唐钢炼铁北区大型绿化料场AYX爱体育获2019 年度冶金行业AYX爱体育设计优秀成果奖三等奖。

    31th December

    副总经理刘存钧代表公司深入现场一线,慰问节期坚守工作岗位的员工。

  •  

     
  •  

     
  •  

     
  •  

     

2018Chronicle of the year

  • First quarter

    05th January

    The subsidiary ,Hebei Three-ring Engineering Consulting co., Ltd, set up the branch of tender agency.

    11th January

    It was awarded the title of "Little Giant of Science and Technology" by the science and technology department of Hebei province

    16th January

    HBTR Xinbaotai project department received the owner's commendation letter.

    26th January

    The annual summary of 2017 and commendation and the work mobilization conference of 2018 were held. Chairman Liu Yuansheng made the annual work report on behalf of the company, comprehensively summarized work achievements of 2017, and arranged the work task of 2018.The meeting was chaired by general manager Dong Wenjin. The deputy general manager Cao Yuan, Liu Cunjun, Zhang Wenlai, chief engineer An Lianzhi attended the conference.

    26th January

    The advanced administrative collectives and advanced individuals of 2017 were commended.17 awards including outstanding contributions of advanced collectives to the production of model works were awarded. 19 collectives and 137 individuals were commended.

    26th January

    The advanced collectives and advanced individuals of The party of 2017 were commended, and 4 awards including advanced party branch and outstanding individual party member for the construction of party conduct and integrity were awarded One party branch and 40 individuals were commended.

    01th March

    HBIS ChengSteel 50,000 tons of vanadium slag molten salt method efficient vanadium clean production demonstration project installation and subsidiary project won Anji Cup Award of Hebei province construction project (provincial high quality project) in 2017.

    19th March

    The design contract for the technical transformation project of HBIS Serbia co., LTD. was signed that a set of 180m2 sintering machine by way of demolition and reuse . In order to meet the needs of the 2250 hot continuous rolling line, a stepping beam heating furnace is built in the reserved position, and the furnace is fueled by blast furnace gas, which is intended to be double-regenerative heating. Newly built 200,000 m thin oil sealed blast furnace gas tank and supporting civil electrical instrument fire water heating air conditioning system and other auxiliary facilities, build and upgrade the public auxiliary system.

  • Second quarter

    22th April

    The registered capital increased from RMB 29.2857 million to RMB 100 million (paid-in).

    22th May

    Increase business scope of "import and export of goods and technologies".

    05th May

    In order to commemorate the 99th anniversary of the May 4th movement and the 96th anniversary of the founding of the youth league, the youth league committee organized the youth staff to carry out the theme activities of following the party forever, presenting the motherland to the youth, and visiting the Great Wall of Hangyaguan, the base of patriotism education. Party secretary Zhang Wenguo led the team.

    10th May

    The company was renamed as Tang Steel International Engineering Technology Co., Ltd.

    21th May

    The youth league committee organized young employees to carry out the basketball competition of the Rising Sun Cup.

    29th May

    It obtained the qualification of tendering agency for government procurement projects, and could carry out various types of tendering agency business (import and export of goods and technologies for government procurement projects for construction projects).

    19th June

    The Zongzi dumplings Competition was organized to all the staff.

    19th June

    Huaxia certification center conducted the annual audit of the company's quality and environmental occupational health system in 2018.

    29th June

    The party committee organized party member representatives to carry on the ceremony of remembering their original intention, remembering their mission and renewing the pledge of party membership.

  • Third quarter

    13th August

    The security management department set up in the organizational structure of TSIC.

    17th August

    The Plot on the west of You Yi west side road and north of Ronghua road, covering an area of 25,601.98 ㎡ (38.4 mu).

    30th August

    Subsidiary Tangshan Yuxiangxinyuan Environmental Protection Technology Co.,Ltd. Increased the capital to RMB 20 million Yuan.

    10th September

    The municipal planning bureau issued the construction land planning license, no. 130201201800045.

    10th September

    The registered capital of the subsidiary Tangshan Yuxiangxinyuan Environmental Protection Technology Co.,Ltd. increased from 5 million Yuan to 20 million Yuan.

    16th September

    TSIC, along with Bohai Guoxin (Beijing) Information Technology Co.,Ltd. signed a strategic cooperation agreement with Zhongguan Information Co.,Ltd. Liu Yuansheng, chairman of TSIC, Liu Cunjun, chairman of Bohai Guoxin, and Liang Qixiu, chairman of Zhongguan signed the agreement on behalf of the parties.

    17th September

    Dai Wenbin from the steel rolling department participated in the mechanical cartographer competition of Hebei province workers' vocational skills competition on behalf of tangshan city and won the sixth place in group.

    17th September

    The project department of green metallurgy engineering technology r&d center of TSIC set up ,of which the project leader is Li Tiejun.

    20th September

    Chairman liu yuansheng attended the 2018 investment promotion meeting and signing ceremony of lubei district, tangshan city, and signed the settlement agreement of green metallurgical engineering technology r&d center project with lubei district innovation industrial park on behalf of the company. The project has a total planned building area of about 38,000 meters, with a floor area ratio of about 1.5, and can accommodate more than 1,000 people after completion.

    23th September

    Party secretary zhang wenguo deputy general manager liu cunjun on behalf of the company to the scene of the frontline, condolences to the Mid-Autumn festival to stick to the work of the supervision staff.

    29th September

    Subsidiary Tangshan Iron&Steel Design&Research Institute Co.,Ltd. Increased the capital to 5 million Yuan.

    30th September

    TSIC obtained the Class A credit certificate issued by China engineering consulting association for metallurgical (including non-ferrous steel) construction engineering consulting unit.

  • Fourth quarter

    08th October

    Bohai guoxin (Beijing) information technology co., LTD.

    09th October

    The Tertiary subsidiary, Zhongke Chengyuan (Beijing) Technology Co., Ltd., was established with a registered capital of 10 million Yuan, registered in Tongzhou district, Beijing. An Lianzhi was appointed as the legal representative of the executive director, Ren dawei as the general manager, and Liu jianxin as the supervisor.

    18th October

    The Tertiary subsidiary, Tangshan Zhiyuan property service Co., Ltd., was established with registered capital of 1 million Yuan and registered place of Lubei district, Tangshan city. Chen Liping served as the legal representative executive director, Sun Liang as the general manager and Deng Aiming as the supervisor.

    26th November

    The new official website was officially launched.

    23th November

    TSIC was recognized as the national high-tech enterprise.

    04th December

    TSIC signed a strategic cooperation agreement with MCC equipment research and design institute, and the chairman of Liu Yuansheng and the general manager of MCC equipment Wang Tong signed the agreement on behalf of both parties.

    26th December

    The construction plan of green metallurgy engineering technology r&d center of TSIC has passed the technical review of municipal planning bureau.

  •  

     
  •  

     
  •  

     
  •  

     

2017Chronicle of the year

  • First quarter

    04th January

    Signed the design contract of blast furnace(3 sets) coal injection projects of ESCO of Iran. The design content includes the coal injection system supporting for three blast furnaces. The total investment of the project is 97.7 million Yuan. The project is designed in accordance with NFPA standards, IEC standards, ANSI/ISA standards, etc. And SAP2000 was used for structural modeling and analysis.

    18th January

    The general contracting project Tangshan stainless steel co., LTD. Material yard renovation project c-type warehouse was completed and put into production. The closed warehouse is 72 meters wide, 152 meters long, 32.8 meters high, with a building area of 6240 square meters and a maximum storage capacity of 75,000 tons.

    19th January

    Held the 2016 annual summary and commend and 2017 work mobilization conference, attended by leaders of the company, representatives of all departments and sub-branches. Chairman and general manager Liu Yuansheng made the 2016 annual work report on behalf of the company, comprehensively summarized the 2016 annual work achievements and deployed the 2017 work tasks. The meeting was held by Secretary of the Party Committee Li Junmin and the recognition decision announced by Deputy General Manager Dong Wenjin. At the meeting, the advanced collective and advanced individual of 2016 were commended, and awards representatives and representatives of young staff made statements.

    09th February

    Sun Hu, deputy mayor of Tangshan city, accompanied by Qi Zuojiang, deputy director of Tangshan finance office, deputy secretary of Lubei district committee and acting district head Li Jianzhong, went to TSIC to investigate and guide the listing of the new third board. Chairman and general manager Liu Yuansheng, secretary of the Party Committee Li Junmin made the work report. Deputy Mayor Sun Hu listened carefully to Liu Yuansheng's report on TSIC history, development, business performance, tax payment and listing on the new third board. Qi Zuojiang, deputy director, further elaborated on the progress of TSIC listing, and Deputy Mayor Sun Hu communicated with relevant personnel of TSIC on the key links of enterprise listing.

    09th February

    Bohai guoxin (Beijing) information technology Co., LtD., a subsidiary company, was incorporated with a registered capital of 5 million Yuan.

    01th March

    Informatization system phase ii running, which fully covered the company's operating management, included the management module of integrated office, human resources, management, market management, project management, design coordination, drawing and archives, the figure to further enhancethe level of the refinement, streamline, standardized management and risk control ability of the enterprise.

    15th March

    "A collection device for flue gas of a stepping sintering machine" has been granted the national utility model patent (patent number: ZL 2016 2 0965132.2). The inventors are Ma Jiangwen, Ma Lijiang and Wang Dongyu.

    20th March

    Change TSIC new version of the logo, logo name: Rising Sun.

  • Second quarter

    06th April

    Organize and carry out physical examination of all employees.

    08th April

    The supervision project GangChengChunYi (phase I, phase ii, phase iii) held the foundation breaking ceremony for the project, officially broke ground, the project includes a total construction area of 1444763 square meters.

    19th April

    General contracting project: the first partial grid frame sliding of the first material field closure project in the north iron making area of TSIS was successfully completed. The net frame of the material yard is 406.4 meters in length, 203.4 meters in width (two spans, 98 meters in each span), 60 meters in height, and 82,662 square meters in construction area. The cumulative sliding method of the net frame is adopted in construction, and a number of advanced technologies such as hydraulic synchronous crawling, hydraulic sliding and computer synchronous control of ultra-large components are integrated. The span of the material yard ranks first in the same kind of grid structure in Asia, the maximum storage capacity of the material yard is 200,000 tons, and the annual dust emission can be reduced by 58,100 tons after completion.

    26th April

    "A kind of high-efficiency and low-cost composite dust removal device" has been awarded the national utility model patent (patent no. : ZL 2016 2 1160149.7). The inventor: Fang Kun, Zhao Bin, Liu Yuansheng, Dong Wenjin, and Su Hong.

    26th April

    "An automatic control device for grab hopper crane" has been granted the national utility model patent (patent number: ZL 2016 2 1164369.7) by Yu Tao, Liu Cunjun and Liu Yan.

    26th April

    "A water leakage monitoring system for blast furnace cooling wall" has been awarded the national utility model patent (patent no. : ZL 2016 2 1160148.2). The inventors are Sun Tao, Liu Cunjun and Yao Yanhui.

    03th May

    Subsidiary of bohai guoxin (Beijing) information technology co., LTD., established was inaugurated and staff mobilization meeting, deputy general manager of TSIS Yao Li, TSIC Liu Yuansheng, TSIC information automation ministry Zhao Zhenrui, TSIC African business minister ShangLi, TSIC deputy general manager of international department minister, bohai guoxin company chairman Liu Cunjun to attend the conference.Liu Yuansheng and Yao li delivered speeches for bohai guoxin company on behalf of TSIC and TSIS respectively.

    27th June

    Party secretary Zhang Wenguo visited the site on behalf of the company to the supervision staff.

    06th May

    The communist youth league committee organized young employees to carry out the activity of "walking in the footsteps of martyrs to review revolutionary years -- 'welcome the 19th National Congress of the Communist Party of China ' themed youth league day", and visited the patriotic education base in Hebei province -- the memorial hall of yanling team in Baiyangdian, led by Secretary of CPC Committee Li Junmin.

    20th May

    Signed the design contract of Morocco UNIVERS ACIER company's molten iron project with an annual output of 500,000 tons, which includes simple material yard, blast furnace feeding system, 78m2 stepping sintering machine, two 45t converters, 35kV substation and supporting public and auxiliary facilities.

    24th May

    Tangshan Sanhuan engineering construction supervision co., LTD., a subsidiary company, signed the first bidding agency contract for construction projects, marking the first step for the company to build a bidding agency business module.

    12th June

    The achievements of the international BIM technology in Tangshan Steel

    15th June

    Hold 2017 annual management review meeting.

    24th June

    General contracting project tangshan Medium and Heavy Plate co., LTD. Material yard pollution comprehensive treatment upgrade project shaft furnace yard closed project was completed and put into operation.

  • Third quarter

    03th July

    Signed the design contract of Shanxi Hongda steelmaking system transformation project, including all the main process design and related supporting design of #1 converter and #3 converter.

    21th July

    TSIC and its subsidiary Sanhuan supervision company passed the recertification audit of quality, environment and occupational health and safety management system by Huaxia certification center. This audit involves the company's management and some functional departments, covering the company's engineering design, consulting, general contracting, measurement and engineering supervision related management activities. After four days of audit, the audit team believes that TSIC and the supervision company system is perfect, the operation control is effective, can meet the needs of sustainable and healthy development of the company.

    23th August

    Party Secretary Zhang Wenguo and his team, representing the company's trade union, went deep into the project supervision of Tangshan Medium and Heavy Plate, Tangshan Iron and Steel High Strength Automobile Plate and Tangshan Iron and Steel North District to "send cool" to the employees.

    24th August

    Tangshan Deputy Mayor Sun Hu and his delegation went to TSIC Research and Guided the listing of the new third board, accompanied by Qi Zuojiang, Deputy Director of City Finance Office, and Zhang Cuixia, Vice District Director of Lubei District. Chairman Liu Yuansheng and Party Secretary Zhang Wenguo made work reports. Chairman Liu Yuansheng made a brief introduction on TSIC's business performance in 2017, the progress of the new third board listing and the future development plan of the enterprise.

    20th September

    Bentley's three-dimensional collaborative design software is fully online, including Aecosim Building Designer, OpenPlant Modeler, BRCM, OpenRoads and so on.

  • Fourth quarter

    17th October

    The relocation meeting of Bohai Guoxin (Beijing) Information Technology Co., Ltd. was solemnly held in Bohai Guoxin New Office, Headquarters Building of High Technologies. Liu Yuansheng, Chairman of TSIC and Liu Cunjun, Deputy General Manager, attended and addressed the relocation meeting.

    27th October

    The Second Congress of TSIC of the Communist Party of China was held. Zhang Wenguo, Secretary of the Party Committee, made a report on the work of the First Party Committee on behalf of the Party Committee. The meeting was presided over by Dong Wenjin, General Manager, and attended by 67 representatives from various departments and sub-branches.

    10th November

    Tangshan Sanhuan Engineering Construction Supervision Co., Ltd., a subsidiary company, was renamed Hebei Sanhuan Engineering Consulting Co., Ltd. and appointed Cao as the former legal representative and executive director. After renaming, Hebei Sanhuan will expand its business model from a single engineering supervision company to a comprehensive international engineering consulting service company which integrates engineering supervision, project management, bidding agent, cost consultation and external contracting.

    06th December

    The design contract for the replacement project of capacity reduction of Haicheng Iron and Steel Co., Ltd. of Houying Group was signed, including the construction of two 1350m2 blast furnaces and supporting facilities, two 120t converters and supporting facilities for steelmaking system, and a set of 30000Nm2/h oxygen generating facilities for oxygen making system.

    07th December

    Iran's Isfahan Steel Works (ESCO) three-dimensional navigation project has been completed. This project is our company's first collaborative design project using Bentley series of three-dimensional software, including Aecosim Building Designer, Open Plant Modeler, BRCM, Power Civil, LumenRT and other modeling and animation production software.

  •  

     
  •  

     
  •  

     
  •  

     

2016Chronicle of the year

  • First quarter

    08th January

    "Comprehensive energy utilization of iron and steel enterprises" will be held.

    14th January

    2015 annual summary commendation and 2016 work mobilization conference was held.General manager Liu Yuansheng made the 2015 annual work report, summarized the 2015 work performance, and deployed the 2016 work plan.

    19th January

    Vietnam hefa iron and steel phase iii 700,000 tons iron smelting project 580m³ blast furnace goes into operation.

    20th January

    Zhao chunguang, xu shuang and zhao wenchao's invention of "hanging central burner for limestone kiln" (patent number: ZL 2015 2 0730831.4) won the national utility model patent.

    21th January

    General manager liu yuansheng visited Vietnam hefa iron and steel group and was received by general manager Chen junyang of hefa group.

    21th January

    Donate children with "langerhan" to support social responsibility with love and action.

    29th January

    Tanggang international "quality promotion year" activities officially launched.

    30th January

    Contract for the engineering design of the EPC project for the preparation of lime and toner at the TOSYSLI steel plant in Algeria.

    03th February

    Liu Cunjun, deputy general manager visited some of the company's retired cadres and extended New Year wishes on behalf of the company.

    03th February

    JSW Salem2 bf overhaul project is completed and put into operation.

    23th February

    Executive deputy general manager Dong Wenjin met with Huang zhen, assistant general manager of China metallurgical huatian engineering technology co., LTD.

    04th March

    Hold the lecture series of "technology lecture hall" -- "electric steelmaking".

    13th March

    "Technology lecture hall" lecture series - "space structure design and optimization", speaker: professor gong jinghai, school of Marine and architectural engineering, Shanghai jiaotong university.

    20th March

    Contract for design and supervision of production line for fiber forming of blast furnace slag and thermal insulation board for buildings.This project is a national science and technology support project, which has won the special fund for national key scientific research projects.

    25th March

    The design scheme of the energy efficiency improvement and renovation project of tangshan iron and steel co., LTD. Passed the review of tangshan iron and steel expert group.

    28th March

    The registered capital increased to 29.2857 million yuan and the articles of association was amended.

    30th March

    Tangshan third ring engineering construction supervision co., LTD., a subsidiary company, has obtained the comprehensive engineering supervision qualification.

  • Second quarter

    06th April

    Organize and carry out physical examination for all employees.

    22th April

    Signed the general contract of type C warehouse of tangshan stainless steel company.

    23th April

    The youth league committee organized and carried out the "May 4th Youth Day" Outdoor activities.

    26th April

    Tanggang veolia (tangshan) water works sewage treatment plant to increase the number of medium filter project completed and put into operation.

    29th April

    Announced 24 annual scientific research and development projects in 2016, including "development and application of steelmaking bottom blowing technology".

    10th May

    Eleven dedusters, including the no.1 sintering tail of the north region of the ironmaking department, were completed and put into operation.

    11th May

    The tangshan branch of hebei iron and steel co., ltd. and the gas replacement project of Zhongrun company were completed and put into operation.

    14th May

    General manager liu yuansheng attended the 2016 national construction steel structure industry conference.

    20th May

    Tanggang international charity foundation was established.

    01th June

    Qi Zuojiang, deputy director of the financial office of tangshan city, and Chen Jidong, deputy chief of lubei district went to the company to investigate the listing work of the new third board, accompanied by liu Yuansheng, general manager of the company.

    16th June

    Signed the supervision contract of the demolition project of Finnish steel works of qinye company.

    16th June

    The congress of staff and workers was convened to elect the first director of staff and the first supervisor of staff and workers of tanggang international co., LTD.

    19th June

    Held tangshan iron and steel international engineering technology co., LTD. Founding meeting and the first general meeting of shareholders, river steel tang steel deputy general manager zhang chi attended the general meeting.

  • Third quarter

    03th July

    The plate project department of TangShan third ring engineering construction supervision co., LTD., a subsidiary company, adopts the grouting reinforcement method of deep underground pipe to reinforce the original underground pipe gallery, saving the cost of 50 million yuan for the owner.

    13th July

    Party secretary Li Junmin leads the team to go deep into the first line of the stainless steel project to send cool air to the on-site supervision staff.

    20th July

    Tanggang international and its subsidiary third ring supervision company have passed the recertification and verification of the quality, environment and occupational health and safety management system by Huaxia certification center.

    05th August

    "Technology lecture series" -- "improving design concept and optimizing engineering design" will be held.

    24th August

    The sintering area construction and installation project of no. 1 bf in the north area of ironmaking won the "Tangshan 2016 high quality engineering award".

    03th September

    To convene the workers' congress and reelect the workers' directors.

    18th September

    Lu feng, assistant to the general manager of MCC north engineering technology co., LTD., visited the company with liu yuansheng, chairman and general manager, and dong wenjin, executive deputy general manager.

  • Fourth quarter

    20th October

    Yao Li, deputy general manager of hegang tanggang, visited the company and listened to the summary of the company's work in 2016 and the report of its development plan in 2017, and put forward hopes and requirements for the company's operation and management.

    22th October

    Chairman and general manager Liu Yuansheng and deputy general manager Zhang Wenlai attended the 15th anniversary celebration of Vietnam Hefa steel group.

    01th November

    Tanggang weier automation co., LTD. Internet + logistics platform construction project completed and put into use.

    02th November

    MCC north engineering technology co., LTD. Chairman dong tao, deputy general manager Wang Lizhong, assistant general manager Lu Feng and five people visited the company, chairman and general manager Liu Yuansheng, executive deputy general manager dong wenjin met.

    04th November

    The organization will set up overseas business units.

    10th November

    Fu jianguo, general manager of hebei xinye engineering technology co., LTD., and xi lei, deputy general manager, visited the company together with liu yuansheng, chairman and general manager.

    14th November

    Contract for the design of pulverized coal preparation and injection engineering of Iranian Isfahan steel plant was signed.

    25th November

    Won the "hebei province small and medium-sized technology enterprises" recognized title.

    01th December

    Won the "engineering survey and design industry 'twelfth five-year' implementation of information construction advanced units" title.

    13th December

    Tangshan third ring engineering construction supervision co., LTD., a subsidiary company, applied for the qualification certificate of engineering bidding agency.

    15th December

    Hold the 2016 annual quality summary and 2017 quality plan meeting, summarize the work of "2016 Quality improvement", and define 2017 as "Quality deepening year".

  •  

     
  •  

     
  •  

     
  •  

     

2015Chronicle of the year

  • First quarter

    06th February

    Tangshan YuXiang ZhuoYi engineering cost consulting co., ltd. held the first plenary meeting, vice general manager Liu YuanSheng attended.

    10th February

    2014 annual summary commendation and 2015 work mobilization conference was held.The company's general manager Liu YuHua made the 2014 annual work report, and party secretary Li Jun held the democratic congress.

    06th March

    Set up water engineering branch.

    25th March

    Signed the project design contract of Tangshan Qanchen Metal Materials Co., Ltd. with an annual output of 3.1 million tons of new metal materials.

  • Second quarter

    15th April

    Liu YuanSheng, deputy general manager, visited Vietnam HeFa iron and steel group and was received by Chen tinglong, chairman of HeFa group and Chen JunYang, general manager.

    25th April

    The youth league committee organized and carried out the "May 4th Youth Day"outing activities.

    27th April

    Subsidiary tangshan third ring engineering construction supervision co., LTD. Registered capital increased to 10 million yuan.

    02th June

    General manager liu yuansheng visited Beijing zhineng xiangying energy saving and environmental protection technology co., LTD., received by chairman li zhanguo and general manager liu guoxin.

    02th June

    Signed a strategic cooperation agreement with Beijing ZhiNeng XiangYing energy saving and environmental protection technology co., LTD.

    19th June

    General manager Liu YuanSheng visited China metallurgical TianGong group co., LTD. Zhang PeiYi, chairman of China metallurgical tiangong group received him.

    19th June

    Signed a strategic cooperation agreement with China metallurgical group co. LTD.

  • Third quarter

    08th July

    Song LiYing, Zhang Chi, Dong WenJin, Su Hong, Huang Fu ShaoBo invention of "a dust dust humidifier spray box" (patent number: 201520112836.0) won the national utility model patent.

    08th July

    Song LiYing, Zhang Chi, Dong WenJin, Su Hong and Huang Fu ShaoBo have won the national utility model patent for "a large ash silo ash inlet module for pneumatic ash transport" (patent no. : 201520113221x).

    08th July

    Feng yuming, ma lijiang, zhang chun, yu liwei and zhang xuemin invented "a waste heat steam power generation device for steel works" (patent no. : 201520113222.4), which won the national utility model patent.

    09th July

    The listing of the new third board was officially launched

    09th July

    The organization shall set up a board of Directors Office and Project Management Department.

    22th July

    "Tangshan Donghua iron and steel enterprise group co., LTD. Coal gas power generation, sintering waste heat comprehensive utilization project" won 2015 HeBei province outstanding engineering survey design second prize.

    22th July

    "Steel rolling depth lifting demonstration project" won the second prize of excellent engineering survey and design of Hebei province in 2015.

    22th July

    "No.3 blast furnace dust removal system and TRT wet method dry method project in north iron making area" won the third prize of hebei province excellent engineering survey and design in 2015.

    22th July

    "Tanggang iron north zone 210m²The flue gas desulfurization project of sintering machine won the third prize of excellent engineering survey and design of hebei province in 2015.

    23th July

    Tangshan third ring engineering construction supervision co., LTD., a subsidiary company, successfully applied for the municipal public engineering supervision class a qualification.

    28th July

    Li junmin, secretary of the party committee, led the team to go deep into the thick plate project to send cool water to the staff.

    05th August

    Yang baolin, deputy mayor of tangshan city, and his party went to the company for research. Liu yuansheng, general manager of the company reported the listing work of the new third board. Yao li, deputy general manager of tangsteel group, and li junmin, party secretary of the company, attended the discussion.

    05th August

    Zhao chunguang, liu biying, wu tiemin and zhang kai's invention of "a kind of dust removal sealing device on the top of inclined bridge of lime kiln" (patent number: ZL2015 2 0229816.1) won the national utility model patent.

    12th August

    Zhao chunguang, liu biying, deng rui and ban baowang invented "a kind of dust removal and sealing device at the bottom of inclined bridge of lime kiln" (patent number: ZL2015 2 0229925.3), which won the national utility model patent.

    16th August

    The second phase of informatization system upgrade was launched

    15th September

    Implement divisional management model

  • Fourth quarter

    16th October

    "Technology lecture series" -- introduction to process of iron and steel metallurgy plant was held.

    21th October

    "Gravity differential material level meter" (patent number: ZL201520465371.7) invented by zhao chunguang and Chen zhenxiang has won the national utility model patent.

    03th November

    Tangshan third ring engineering construction supervision co., LTD., a subsidiary company, successfully applied for class a qualification of chemical and petroleum engineering supervision.

    09th November

    The special equipment design license (pressure pipeline) of the People's Republic of China shall be renewed, and the GD1 and GD2 levels shall be added, and the validity period shall be five years.

    18th November

    Liu Xiang, Dong WenJin, Sun LiFa and Yao YanHui have won the national utility model patent for "a kind of automatic water filling device for dust removal silo" (patent number: ZL 2015 2 0552266.7).

    27th November

    "Technology lecture series" -- "principles of pipe bracket design" will be held.

    30th November

    China steel equipment co., LTD. And the signing of Algeria TOSYSLI steel mill melzi kiln engineering design contract.

    30th December

    Tangshan YuXiang ZhuoYi engineering cost consulting co., LTD., a subsidiary of tangshan YuXiang ZhuoYi engineering cost consulting co., LTD., has successfully applied for class b consulting certificate of engineering cost consulting enterprise.

  •  

     
  •  

     
  •  

     
  •  

     